THE Metropolitan Manila Development Authority (MMDA) has proposed the construction of rainwater impounding facilities inside Camp Aguinaldo to ease recurring flooding on EDSA, with the proposed design released on Wednesday, Aug. 27.
MMDA proposes rainwater facilities in Camp Aguinaldo to mitigate EDSA flooding
The plan requires detention ponds that will temporarily store excess rainwater during downpours and gradually release it into the EDSA drainage system, leading to the Makiling Creek.
As proposed, the project will be implemented in three phases, covering 182 hectares and involving a golf course near Gate 2, another near Gates 3 and 4, and an open space near Gate 6., This news data comes from:http://771bg.com
For the first phase near Gate 2, the detention pond has a 361-meter perimeter, a 4,650-square-meter area, an 8-meter depth, and a 37,200-cubic-meter capacity, designed for a 25-year return period (15.6 mm per hour over 24 hours), exceeding the needed 36,945 cubic meters.
MMDA’s schematic shows that under normal weather, the water bypasses the pond and flows through the lagoon to EDSA.
During heavy rain, floodgates divert water flow into the pond; after rain, pumps discharge stored water slowly into EDSA toward the Makiling Creek.
The scope of works covers the impounding area, operations and powerhouse, drainage and electromechanical works, and landscaping and golf course restoration, with a treatment facility under consideration.
Officials said operations and maintenance arrangements, and a memorandum of agreement, are still under discussion.

- AFP: It would take more than a tugboat to tow BRP Sierra Madre from Ayungin Shoal
- US approves .5M in assistance to Nigeria to help address hunger
- Filipino member of AHOP K-pop group says Manila concert a dream come true
- Some areas in Metro Manila, Bulacan, Quezon to have power interruptions due to maintenance work
- Australia to tackle deepfake nudes, online stalking
- Thai woman jailed for 43 years for lese majeste freed
- Marcos suspends importation of regular, well-milled rice for 60 days
- Public Works Chief Vince Dizon demands courtesy resignations to 'clean house'
- Vico encourages citizens on Heroes’ Day to be brave
- Escudero urges list of unfundable projects for 2026 budget